

The Transocean Nordic needs to be dry transported. The dry transport shall be done by a semi-submersible available.
For the performance of this dry transport, the Transocean Nordic needs to be wet transported. The wet transport shall be done by tugs available from the float-off location to its drillling position, and then from its drilling position to the float-on location.
Around May 2008, the Transocean Nordic will be loaded in Lat. XX°XX.X′ N/ Long. XXX°XX.X′E in Singapore using the float-on method. After the voyage it will be discharged using the float-off method in Lat. XX°XX.X′ N/ Long. XXX°XX.X′E in Sakhalin.
Around May. 2008, after float-off operation in Sakhalin, the Transocean Nordic needs to be wet transported for about a distance of 500 nautical miles from the discharge location ( Lat. XX°XX.X′ N/ Long. XXX°XX.X′E) to its drilling position ( Lat. XX°XX.X′ N/ Long. XXX°XX.X′E).
The Transocean Nordic must be in its drilling position at latest Mid Jun.2008.
Around Sep.2008., the Transocean Nordic will be loaded in Lat.XXOXX.X’ N/ Long.XXXOXX.X’ E in Sakhalin using the float-on method. After the voyage it will be discharged using the float-off method in Lat. XX°XX.X′ N/ Long. XXX°XX.X′E in Singapore.
Around Sep.2008, before float-on operation in Sakhalin, the Transocean Nordic needs to be wet transported for about a distance of 500 nautical miles from its drilling position ( Lat. XX°XX.X′ N/ Long. XXX°XX.X′E) to the loading location ( Lat. XX°XX.X′ N/ Long. XXX°XX.X′E).
The Transocean Nordic must departure from Sakhalin at latest on Oct.2008.
From Singapore to Sakhalin, Russia

The wet towing distance is about 500 nautical miles.
裝船狀態: |
重量: |
15930 噸 |
垂直重心: |
26.48米 從龍骨算起 |
縱向重心: |
23.35米 從29框架算起 |
橫截面重心: |
0.04米 從中心線到左舷 |
平臺長: |
81.3米 |
平臺寬: |
93.87米 |
腿長: |
151.50米 |
深度: |
8米 |
鑽采機突出部分: |
4.48米 龍骨以下 |
吃水: |
4.75米 |
吃水(包括鑽采機突出部分): |
9.23米 |
航行狀態: |
重量: |
16864 噸 |
垂直重心: |
25.27米 從龍骨算起 |
縱向重心: |
27.4米 |
橫截面重心: |
0.24米 從中心線到左 |
鑽采機突出部分: |
4.48米 龍骨以下 |